Do you have a solutions to prevent any health and pollution problems of randomly disposing the
plastic wastes ?
This place was a landfill and the upper strata of the ground is filled with plastic waste from
the garbage, dumping, which is up to 7 to 8 ft depth.
So the foundation for the buildings need special methods and for technology to implement
the foundations with additional costs estimated than the normal construction rate of per square feet.
The ground which is filled with plastic waste can cause pollution problems as well as Necessitating special technology to set up the buildings, so any advice on the technical know-how to overcome these hazardous problems such as toxic gas emissions problems are warmly welcome.
Contributions to Raise Funds for the Construction
at the Relocated site will be Welcome most Sincerly
The FFSS (Yangon) has its main office (head office) situated at a compound of a monastery, Brama-Vihara Pasiyathi Sarthindaik at 16/2 ward, Thingyun Township, Yangon.
It is now to be relocated to a plot of land comprising of about 2.1 acres, which is contributed
by the State Government since 2004. The venue is located at 48 ward, Bomu Ba Htoo Street, Northern
Dagon. The society is trying to raise funds for the construction of office buildings and other
appropriate structure for the mediare programmers’ at that site.
This place was a landfill and the upper strata of the ground is filled with plastic waste from the garbage, dumping, which is up to 7 to 8 ft depth. So the foundation for the buildings need
special methods and for technology to implement the foundations with additional costs estimated
than the normal construction rate of per square feet.
At present , the construction of the main building is underway. Part of the fencing of the
compound and the main gate have been completed before hand with the financial assistance from
the local and foreign donors.
The main building will be a concrete two-storey one of 50 ft by 60 ft or 6000 square feet of
total floor area. Halt of the building shall be used for the dispensary and a diagnostic
laboratory and the other half shall housed the office and the reception are for donation purpose. The upper storey of the office part is planned to establish a public library and learning
centers in the future.
The elevation plan for the main building is shown here together with the photos of various stages
of construction and ground breaking works.
The contact between the Society and the Kaung Set Thar Engineering group has been signed to
implement the main building with the down payment of 35 millions kyats and at a cost of 16000/- kyats per square feet.(International price - 13.5 US$ per square feet).The first building is
estimated to cost about 100 million kyats .